Prime power that runs as long and as hard as the operation.
Air-cooled, modular prime power built for remote sites and motor-heavy equipment — 20 to 30% less fuel, no radiator, no single point of failure.
Why mining operations switch to Mattur
Fuel Burn should follow work.
Legacy generators waste fuel at partial load. Mattur doesn't.
Fuel Savings Calculator
What is your generator really burning?
Enter your current genset's fuel economics and see what Mattur saves you. Real operating burn, not inflated full-load numbers.
Your Current Genset
USD per gallon
Average running time per day
Not sure of your burn?
Most legacy diesel units run at 30 to 50 percent load, where they burn fuel inefficiently.Typical load 75%
Generator size 150 kW
How it works: baseline = fuel cost x gallons per hour x runtime. Annual = baseline x days per week x 52 weeks. Savings range applies a 20 to 30 percent fuel reduction from Mattur's generator technology.
Figures reflect fuel cost only and exclude DEF, maintenance, downtime, and other ownership costs. Estimates for illustration; actuals vary by load, duty cycle, and site conditions.
Intelligent Transient Boost
Full surge power. No bigger unit.
Up to 2× Peak Power with Intelligent Transient Boost. No oversizing.
Legacy: Voltage dips on hard starts vs. Mattur: Instant surge delivery with stable voltage
One System.
Every Load.
Mattur delivers single- and three-phase simultaneously from one integrated power architecture. No extra generators. No workarounds.
- 1. Single- and three-phase at the same time
- 2. Fewer cables and support equipment
- 3. Stable output as demand changes
Replace multiple generators with one integrated system.
Power + Storage. One Platform.
Battery modules share the same platform and form-factor as the 14 kW power modules — fitting into the same trailers and skid-mounted enclosures. Mix power and batteries in any ratio the job needs.
One architecture. Any Scale.
Mattur is built from standardized 14 kW power modules that deploy standalone, aggregate into trailers and scale across multiple Power Blocks — adapting as the job grows.
14 kW
Power Module
Edge 28 Trailer
Up to 2, 14 kW Power Modules
Edge 56 Trailer
Up to 4, 14 kW Power Modules
Skid-mounted Power Block 140kW
Scales without limit
Mattur vs. the generator on your site today
| Site need | Legacy generator | |
|---|---|---|
| Fuel efficiency at prime load | Fixed RPM — full burn regardless of load | Variable RPM — 20–30% less fuel |
| Hard starts on motor-heavy equipment | Requires oversizing | 2× in-rush via Intelligent Transient Boost |
| Uptime during service | Full shutdown | Swap a module, site keeps running |
| Cooling in dusty, abrasive environments | Radiator-dependent, contamination risk | Air-cooled, no radiator |
| Redundancy | Single unit = single point of failure | Modules operate independently |
| Right-sizing as the site evolves | Replace the unit | Add or remove 14 kW modules |
Get pricing & availability
Tell us the site, the load profile, and the deployment window. We'll quote rental or purchase options in 24 hours.